Construction

Your reservations stop being a matter of word against word

A poorly documented reservation means a retention guarantee that stays blocked and a subcontractor who contests. The site photo decides who pays.

No imported files. Proof is born in the lens.

01 · Capture

At shot time only

02 · Analysis

AI · 500+ control points

03 · Decision

When in doubt, we refuse

What happens today

The subcontractor claims the defect came after their work. You have photos. Nothing establishes their capture date in an enforceable way.

What VERiXiS changes

  1. 01Progress documented at a certain date, week after week
  2. 02Reservations and releases attached to the same file
  3. 03Payments backed by proof the subcontractor can verify
  4. 04A file sealed at handover

FAQ

How many photos per site?

As many as needed. A timestamped photo alone is no longer enough: the cost is no longer a site visit, but capture proof.

VERiXiS

Seal your next file before the next control

Choose a plan and create your account.